Works carried out on a live site in a controlled fashion to ensure that the existing WWTP remains operational at all times. Working with restricted access and around existing services.
Work includes:
- Placing stone for piling mat;
- Excavation of foundations;
- Breaking down and prepare piles;
- Excavation for ELPS chambers;
- Demolition of existing underground structures;
- Installation of services.