Project Name:

Polmadie Maintenance Project

Project Location:

Glasgow, Scotland

Client:

Bear Scotland

Main Contractor:

John Paul Construction

Value:

£1,200,000
3LimeStabilisationWorks3
1LimeStabilisationWorks1
6LimeStabilisationWorks6
4LimeStabilisationWorks4
5LimeStabilisationWorks5
2LimeStabilisationWorks2
7LimeStabilisationWorks7
9LimeStabilisationWorks9
8LimeStabilisationWorks8
10LimeStabilisationWorks10
11LimeStabilisationWorks11
SpecialistWorksP2of3
previous arrow
next arrow
3LimeStabilisationWorks3
1LimeStabilisationWorks1
6LimeStabilisationWorks6
4LimeStabilisationWorks4
5LimeStabilisationWorks5
2LimeStabilisationWorks2
7LimeStabilisationWorks7
9LimeStabilisationWorks9
8LimeStabilisationWorks8
10LimeStabilisationWorks10
11LimeStabilisationWorks11
SpecialistWorksP2of3
previous arrow
next arrow

Works includes:

  • Full earthworks on this brownfield heavily contaminated site of 23,000 sq.m.;
  • Earthworks cut/fill in heavily contaminated soils and soft ground improvement techniques were utilised in minimising off-site disposal and import of fill;
  • Installation of surface water, including SUDS attenuation pond, and foul drainage systems and utility ducting;
  • A 450mm diameter outfall pipeline was constructed across the live M74 motorway, Junction 1.