Works includes:
- Full earthworks on this brownfield heavily contaminated site of 23,000 sq.m.;
- Earthworks cut/fill in heavily contaminated soils and soft ground improvement techniques were utilised in minimising off-site disposal and import of fill;
- Installation of surface water, including SUDS attenuation pond, and foul drainage systems and utility ducting;
- A 450mm diameter outfall pipeline was constructed across the live M74 motorway, Junction 1.