Project Name:

New Ross By-Pass

Project Location:

New Ross, Wexford, Ireland

Client:

TII

Main Contractor:

NRJV

Value:

€4,000,000
previous arrow
next arrow
previous arrownext arrow
Slider

Work Includes:

  • Bulk excavation and rock excavation of approximately 400,000 cu.m for the West of the Barrow section;
  • Transport approximately 60,000 cu.m of material by road haulage;
  • Excavation and replace 30,000 cu.m of bog marsh material including management of the disposal locations;
  • Excavation of foundations for pier abutments for cable stayed bridge river crossing;
  • Install a number of precast culverts and underpasses, responsible for the excavation and earthworks, concrete works, lifting, temporary works, placing and sealing of units;
  • Accommodation works for local residents.